Madhya Pradesh High Court: Victims Must be Given a Hearing Even Before Closure Report Rejection  ||  Delhi HC: Payment of ‘Pagri’ Does Not Render Tenancy Non-Terminable, Allowing Eviction  ||  Ker HC Examined Whether Electro-Homeopathy Can be Practised Without Registration under Medical Laws  ||  Delhi HC: Better Possessory Title Holder Can Recover Property From Occupant Without Superior Right  ||  Bombay High Court: Compensatory Afforestation Must Be in Same or Nearby Locality For Residents  ||  Bombay High Court Protects ‘MEFTAL-SPAS’, Restrains Use of Similar Drug Brand  ||  Supreme Court: Inclusion in Revised Select List Does Not Give TN MV Inspectors a Vested Right  ||  Bombay HC: ICC Cannot Hear Sexual Harassment Complaint over Non-Employer Transport Incident  ||  Ker HC Upholds Rule that Homeopathic Doctors Must Cancel Registration Before Enrolment as Advocates  ||  J&K&L HC: Evidence Negating Penetration Warrants Conviction For Attempt to Rape, Not Rape    

Interest Equalization Scheme (IES) on Pre and Post Shipment Rupee Export Credit- (Reserve Bank of India) (22 Feb 2024)

MANU/RMIC/0019/2024

Banking

1. This is with reference to the instructions issued vide circulars No. DOR.STR.REC.93/04.02.001/2021- 22 dated March 8, 2022 and DOR.STR.REC.39/04.02.001/2022-23 dated May 31, 2022.

2. Government of India has allowed for extension of the Interest Equalization Scheme for Pre and Post Shipment Rupee Export Credit ('Scheme') up to June 30, 2024. The rate of interest equalization shall be 2% for Manufacturers and Merchant Exporters exporting under specified 410 HS lines and 3% to the MSME manufacturers exporting under any HS line.

3. Further, Government has advised the following modifications to the scheme:

a) Average interest rate: With effect from FY 2023-24, the banks which have priced the loans covered under this scheme at an average interest rate of greater than Repo Rate + 4% prior to subvention would be subjected to certain restrictions under the scheme. Based on an assessment undertaken for FY 2023-24, Director General of Foreign Trade (DGFT) will identify the banks which are in breach of the above provision. Such banks shall be restricted from participating in the scheme till they furnish an undertaking (in the format as enclosed in the Annex) to DGFT. Any further breach as assessed by DGFT thereafter may lead to debarment from the scheme.

b) Cap on subvention amount: The annual net subvention amount has been already capped at Rs 10 Cr per Importer-Exporter Code (IEC) in a given financial year and the same has been communicated to the trade & industry and banks vide DGFT Trade Notice No.05 dated May 25, 2023. Accordingly, all disbursement from April 1, 2023 shall be reckoned for this purpose.

4. All other provisions of the aforesaid circulars shall remain unchanged.

Tags : IES   PRE AND POST SHIPMENT  

Share :        

Disclaimer | Copyright 2026 - All Rights Reserved