Delhi High Court Criticizes DDA for Gross Negligence in Construction of Apartments  ||  Del. HC: 24 Seven Files Suit for Trademark Violation against Godfrey Phillips  ||  NCLAT: RP Can Withdraw Application u/s 12A of IBC Before it is Heard or Allowed  ||  NCLAT: Submission of Status Report in Cr. Proceeding Won’t Have Bearing While Deciding App u/s 7 IBC  ||  Cal. HC: Statutory Framework under CGST Act Provides Mechanisms to Address Assessee’s Concerns  ||  Delhi HC Issues Notice on Plea by Yuvraj Singh Foundation Seeking Registration under FCRA  ||  Cal. HC Quashes Cruelty Proceedings against Brother-In-Law of Woman after 18 Years of Marriage  ||  SC Explains Conditions to Invoke Section 53-A of the Transfer of Property Act, 1882  ||  NCLT: IBC Doesn’t Have Provision to Issue Multiple Demand Notices before Filing Petition u/s 9  ||  J&K HC: Can Set Aside an Award Passed by Ineligible Arbitrator    

Mandatory Safety Audits- (Press Information Bureau) (10 Aug 2023)

MANU/PIBU/2745/2023

Motor Vehicles

Road Safety audit (RSA) is an essential part of any National Highway development project. RSA is carried out at different stages namely during design, construction and before issue of completion certificate of the project. Detailed guidelines for carrying out Road Safety audits and implementing the audit recommendations for National Highway Projects have been issued from time to time.

The Government of India has taken initiatives towards setting up of Trauma Care Facilities (TCFs) along the national highways with an overall objective to bring down preventable deaths due to road accidents. During the 11th Five-year Plan, under the scheme namely 'Assistance for Capacity Building for Developing Trauma Care Facilities in Govt. Hospitals on National Highways', financial assistance was provided to States/Union Territories (UTs) for upgrading/ strengthening trauma care facilities in identified Government Hospitals/Medical Colleges. The scheme continued during 12th Five Year Plan as 'Capacity Building for Developing Trauma Care Facilities in Government. The Programme continued beyond 12th Five Year Plan as 'National Programme for Prevention and Management of Trauma and Burn Injuries' wherein Trauma Care Facilities identified during 11th and 12th Five Year Plan are being supported.

The Vehicles are over speeding beyond the limit even up to speeds of 150-160 Kmph in some cases and changing lanes or overtaking at such high speeds frequently, which led to accidents on the Bangalore - Mysore Access Controlled Highway.

Steps taken -

• Speed limit sign boards have been installed at regular intervals all along the Highway as per IRC guidelines.

• Additional informatory boards at all the entry-exit locations are also provided for the guidance to the travelers.

• 4 numbers of route patrolling vehicles (2 in each package) are placed on the project stretch. Camera surveillance has been provided.

• Overhead informatory Variable Message Sign (VMS) have been provided to avoid over speeds and take utmost precautions to avoid accidents.

• 2-wheelers, 3-wheelers and other slow-moving vehicles like non-motorized vehicles, agricultural tractors (with or without trailers) have been prohibited from using the Bangalore-Mysuru Access Controlled Highway.

• Road Safety Committee for safety inspection of Bengaluru-Mysuru Access Controlled Highway has been constituted by NHAI.

• The State Police Department has enforced speed limit with Interceptors.

Tags : SAFETY AUDITS   RECOMMENDATION   IMPLEMENTATION  

Share :        

Disclaimer | Copyright 2024 - All Rights Reserved