Delhi HC: Bipolar Disorder Alone Does Not Qualify as Medical Disability Without Benchmark Criteria  ||  Kerala HC: Excommunicating Knanaya Catholics For Marrying Outside the Community is Unconstitutional  ||  Kerala HC: Temporary Use of Religious Land For Public Infrastructure is Not a ‘Transfer’ under Law  ||  P&H HC: Habeas Plea in Child Custody Case Not Maintainable if Child is With Natural Guardian and Safe  ||  Delhi HC: Illegal Termination Does Not Automatically Entitle Employee to Reinstatement or Back Wages  ||  Gujarat High Court: Forcing Toddler to Attend Court 6 Hours Weekly For Grandfather Visits is Unjust  ||  Supreme Court Rejects Sameer Wankhede’s Plea, Directs Timely Resolution of Disciplinary Proceedings  ||  Supreme Court Rejects NHAI Review on Solatium Retrospectivity, Bars Reopening Settled Claims  ||  SC: Excise Duty Exemptions Based on Intended Use Must be Construed Liberally For Assessee  ||  Supreme Court: DSC Personnel Eligible For Second Pension; Allows Condonation of Shortfall    

Central Electricity Authority notifies the National Electricity Plan for the period of 2022-32 - (31 May 2023)

Electricity

The Central Electricity Authority (CEA) has notified the National Electricity Plan (NEP) (Vol-I Generation) for the period of 2022-32. The plan documentincludes the review of the last five years (2017-22), a detailed plan for the next five years (2022-27) and the prospective plan for the next five years (2027-32).Funds to the tune of Rs. 33.60 lakh crore needed for power generation capacity addition from 2022-2032.

According to the NEP document, the projected All India peak electricity demand and electrical energy requirement is 277.2 GW and 1907.8 BU for the year 2026-27 and 366.4 GW and 2473.8 BU for the year 2031-32 as per 20th Electric Power Survey (EPS) Demand projections. The Energy Requirement and Peak Demand are inclusive of the impact due to increased adoption of Electric Vehicles, Installation of Solar roof tops, Production of Green hydrogen, Saubhagya scheme etc.The projection of total capacity addition is in line with the target of the country to achieve a non-fossil based installed capacity of around 500 GW by the year 2029-30.NEP envisages that the share of non-fossil based capacity is likely to increase to 57.4% by the end of 2026-27 and may likely to further increase to 68.4% by the end of 2031-32 from around 42.5% as on April, 2023.

Electricity Act, 2003 has been enacted and came into force from 15.06.2003. The objective is to introduce competition, protect consumer’s interests and provide power for all. The Act provides for National Electricity Policy, Rural Electrification, Open access in transmission, phased open access in distribution, mandatory SERCs, license free generation and distribution, power trading, mandatory metering and stringent penalties for theft of electricity.As per Section 3(4) of the Electricity Act, 2003, Central Electricity Authority has been mandated to prepare a National Electricity Plan (NEP) in accordance with the National Electricity Policy and notify such plan once in five years.

Tags :   NEP  NOTIFICATION  REVIEW

Share :        

Disclaimer | Copyright 2026 - All Rights Reserved